Merlins Bridge Railway Bridge

Pembroke Road railway bridge replacement in Haverfordwest to be completed this weekend

Residents are reminded that essential work to replace Pembroke Road railway bridge will be completed this weekend.  

As part of the £4.25m upgrade project, over the weekend engineers will remove the existing rail track and bridge deck, which has been in place since 1937. The team will then fit a new, more resilient bridge structure and reinstate the track, as part of Network Rail’s Railway Upgrade Plan to improve the reliability of the railway.

To ensure teams can deliver the work as efficiently and as safely as possible, part of Pembroke Road will require a short, temporary closure between the railway bridge and Merlins Bridge Welfare Hall. 

The road will be closed to through traffic and pedestrians from 8pm on Friday 18 January 2019 until 6am on Monday 21 January.  Clay Lane will also be temporarily closed to all through traffic during this time.

Leave a Reply

Your e-mail address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.